Housatonic Wild and Scenic River Act of 2022
Summary
Housatonic Wild and Scenic River Act of 2022
This bill designates specified segments of the Housatonic River in Connecticut as components of the National Wild and Scenic Rivers System.
The designation of the river segments must not impact or alter the existing terms of permitting, licensing, or operation of
- the Falls Village Hydroelectric Generating Station located in Falls Village, Connecticut, or
- the Bulls Bridge Hydroelectric Generating Station located in New Milford, Connecticut.
The designation of the river segments must also not preclude the Federal Energy Regulatory Commission from licensing, relicensing, or otherwise authorizing the operation or continued operation of those facilities.
The authority of the Department of the Interior to acquire lands for the river segments shall be
- limited to acquisition by donation or acquisition with the consent of the owner, and
- subject to the additional criteria set forth in the Housatonic River Management Plan.
No land or interest in land may be acquired for the river segments by condemnation.
Timeline
- Sep 21, 2022Committee on Energy and Natural Resources Subcommittee on National Parks. Hearings held. With printed Hearing: S.Hrg. 117-475.
- May 2, 2022Read twice and referred to the Committee on Energy and Natural Resources.
- May 2, 2022Introduced in Senate
In the News
- As Musk steps back, DOGE looks to Congress to finish what it started - The Guam Daily Post
- Ghana’s Gyata Nation Participates in Global Media Congress 2024 - GhanaWeb
- Library of Congress to Celebrate National Cherry Blossom Festival - The Library of Congress (.gov)
- How Congress can save resident physicians $12,000 a year - American Medical Association
Contact your representatives about this bill in under 2 minutes.
📬 Contact Your Reps →